书签 分享 收藏 举报 版权申诉 / 2
1

类型[20140206]IF00009_美国国务院发布了Keystone XL管道的最终EIS下一步是什么?.pdf

  • 上传人:任**
  • 文档编号:24039
  • 上传时间:2022-06-24
  • 发布时间:2014-02-11
  • 格式:PDF
  • 页数:2
  • 大小:81.44KB
  • www.crs.gov | 7-5700 February 6, 2014 The State Department Releases Its Final EIS for the Keystone XL Pipeline. Whats Next? Overview On January 31, 2014, the U.S. Department of State released the Final Environmental Impact Statement (EIS) for the Keystone XL Pipeline Project. Pursuant to the National Environmental Policy Act (NEPA), the State Department was required to prepare the EIS to assess the potential impacts to the human and natural environment associated with its decision to approve or deny TransCanadas application for a Presidential Permit. The Keystone XL Pipeline Project would transport crude oil across the U.S.-Canada border. In accordance with Executive Order (E.O.) 13337, the construction, operation, and maintenance of a pipeline that would transport crude oil across the U.S. border requires a Presidential Permit from the State Department. A number of such permits have been issued in the past. In accordance with E.O. 13337, a decision to issue a permit is predicated on the departments determination that the proposal would “serve the national interest.” With the issuance of the Final EIS, the State Department said it will now focus on making that determination. The Fi
    展开阅读全文
    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    20140206 20140206IF00009_美国国务院发布了Keystone XL管道的最终EIS。下一步是什么? IF00009_ 美国国
    1
    提示  联参智库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:[20140206]IF00009_美国国务院发布了Keystone XL管道的最终EIS下一步是什么?.pdf
    链接地址:https://www.lianhezuozhan.com/doc/24039.html
    1

    客服:010-66465788   北京联参科技有限公司版权所有  工业和信息化部备案/许可证编号:京ICP备2022007273号-1



    联参智库