书签 分享 收藏 举报 版权申诉 / 5
1

类型[20171121]IN10825_Keystone XL管道:最近的事态发展.pdf

  • 上传人:任**
  • 文档编号:26831
  • 上传时间:2022-06-24
  • 发布时间:2017-11-21
  • 格式:PDF
  • 页数:5
  • 大小:745.89KB
  • CRS INSIGHT Prepared for Members and Committees of Congress INSIGHTINSIGHTi i Keystone XL Pipeline: Recent Developments name redacted Specialist in Energy and Infrastructure Policy name redacted Specialist in Natural Resources Policy November 21, 2017 Introduction TransCanadas proposed Keystone XL Pipeline would transport oil sands crude from Canada and shale oil produced in the Bakken region of North Dakota and Montana to a market hub in Nebraska (Figure 1). On November 20, 2017, the Nebraska Public Service Commission (PSC) approved the “alternative mainline” route for the Nebraska segment of Keystone XL which would co-locate some of the new pipeline with the companys existing Keystone (Mainline) Pipeline. This route differs from the siting that TransCanada originally proposed (Figure 2, “preferred route”). Due to the PSCs decision, Keystone XL may require additional federal authorizations and revision of existing ones, among other consequences, increasing the regulatory and economic uncertainty around the pipelines construction. Congressional Research Service 7-. www.crs.gov IN10825
    展开阅读全文
    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    20171121 20171121IN10825_Keystone XL管道:最近的事态发展 IN10825_Keystone XL 管道 最近 事态 发展
    1
    提示  联参智库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:[20171121]IN10825_Keystone XL管道:最近的事态发展.pdf
    链接地址:https://www.lianhezuozhan.com/doc/26831.html
    1

    客服:010-66465788   北京联参科技有限公司版权所有  工业和信息化部备案/许可证编号:京ICP备2022007273号-1



    联参智库