书签 分享 收藏 举报 版权申诉 / 4
1

类型[20200218]IN11223_FERC指示PJM扩大最低报价规则.pdf

  • 上传人:任**
  • 文档编号:28924
  • 上传时间:2022-06-24
  • 发布时间:2020-02-18
  • 格式:PDF
  • 页数:4
  • 大小:499.99KB
  • CRS INSIGHT Prepared for Members and Committees of Congress INSIGHTINSIGHTi i FERC Directs PJM to Expand Minimum Offer Price Rule Richard J. Campbell Specialist in Energy Policy February 18, 2020 On December 18, 2019, the Federal Energy Regulatory Commission (FERC) issued an order directing the PJM regional transmission organization (RTO) to expand its Minimum Offer Price Rule (MOPR) as a move to address subsidies to electric power generation resources by states, with certain exemptions. FERC stated that it acted “to protect the competitive capacity market administered by PJM” by requiring PJM to expand its MOPR to apply to any new or existing power generation resource that receives, or is entitled to receive, a state subsidy, unless a FERC-determined exemption applies. FERC initiated a hearing under section 206 of the Federal Power Act (FPA) to make its determination that PJMs Open Access to Transmission Tariff was “unjust and unreasonable,” since it did not account for the effect of these subsidies. Background RTOs and independent system operators (ISOs) manage the electric transmission systems and the competitive wholesale electric energy markets, under FERCs oversight. RTOs ess
    展开阅读全文
    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    20200218 IN11223_FERC 指示 PJM 扩大 最低报价 规则
    1
    提示  联参智库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:[20200218]IN11223_FERC指示PJM扩大最低报价规则.pdf
    链接地址:https://www.lianhezuozhan.com/doc/28924.html
    1

    客服:010-66465788   北京联参科技有限公司版权所有  工业和信息化部备案/许可证编号:京ICP备2022007273号-1



    联参智库