书签 分享 收藏 举报 版权申诉 / 4
1

类型[20200727]IN11471_尼罗河大坝争端:国会议题.pdf

  • 上传人:任**
  • 文档编号:29582
  • 上传时间:2022-06-24
  • 发布时间:2020-07-27
  • 格式:PDF
  • 页数:4
  • 大小:593.07KB
  • CRS INSIGHT Prepared for Members and Committees of Congress INSIGHTINSIGHTi i The Nile Dam Dispute: Issues for Congress July 27, 2020 Overview A long-running dispute between Ethiopia, Egypt, and Sudan over the waters of the Nile flared in 2020, as Ethiopia moves toward completion of Africas largest hydroelectric power project, the Grand Ethiopian Renaissance Dam (GERD). The domestic stakes are high for both Ethiopian Prime Minister Abiy Ahmed, who seeks to guide Ethiopia through a fragile political transition, and Egypts President Abdel Fattah al Sisi, who seeks to preserve Egypts share of the Nile amidst population growth, pollution, and rising sea levels. Efforts to resolve the conflict, including by the United States, have yet to result in a final agreement. Alongside the potential for the dispute to escalate, failure to reach an accord could set a negative precedent for transboundary water cooperation at a time of growing global concern over climate change, demographic growth, and resource scarcity. Background For Ethiopia, where almost 70% the rural population lacks access to electricity, the GERD would significantly expand domestic power capacity and allow the country to sell
    展开阅读全文
    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    20200727 IN11471_ 尼罗河 大坝 争端 国会 议题
    1
    提示  联参智库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:[20200727]IN11471_尼罗河大坝争端:国会议题.pdf
    链接地址:https://www.lianhezuozhan.com/doc/29582.html
    1

    客服:010-66465788   北京联参科技有限公司版权所有  工业和信息化部备案/许可证编号:京ICP备2022007273号-1



    联参智库