书签 分享 收藏 举报 版权申诉 / 3
1

类型[20211109]IN11798_5号线管道:更换隧道项目.pdf

  • 上传人:任**
  • 文档编号:31384
  • 上传时间:2022-06-24
  • 发布时间:2021-11-10
  • 格式:PDF
  • 页数:3
  • 大小:774.03KB
  • CRS INSIGHT Prepared for Members and Committees of Congress INSIGHTINSIGHTi i Line 5 Pipeline: Replacement/Tunnel Project November 9, 2021 The Line 5 Pipeline is a 30-inch, 645-mile pipeline owned by Enbridge carrying up to 540,000 barrels per day of crude oil and natural gas liquids from Superior, WI, to Sarnia, Ontario (Figure 1). A key segment of Line 5 is an underwater crossing at the Straits of Mackinacbetween Michigans upper and lower peninsulaswhere the pipeline runs for approximately four miles across the lakebed. This crossing has been an environmental concern due to the risk it poses of a “worst case” oil spill into the Great Lakes. Figure 1. Enbridge Line 5 Pipeline Source: CRS using data from Platts, and Esri Data & Maps 2019. Under the terms of various state agreements, Enbridge plans to replace this pipeline segment with a new one constructed through a tunnel beneath the lakebedwhich requires federal approval. Enbridge continues operating the existing pipeline in the meantime. However, the state of Michigan has ordered Line 5 to shut down. Whether the pipeline should continue operating in its current configuration, and whether the federal government should grant a tun
    展开阅读全文
    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    20211109 IN11798_5 线管 更换 隧道 项目
    1
    提示  联参智库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:[20211109]IN11798_5号线管道:更换隧道项目.pdf
    链接地址:https://www.lianhezuozhan.com/doc/31384.html
    1

    客服:010-66465788   北京联参科技有限公司版权所有  工业和信息化部备案/许可证编号:京ICP备2022007273号-1



    联参智库