书签 分享 收藏 举报 版权申诉 / 3
1

类型[20220412]IF11672_海岸警卫队水道商业切割机(WCC)计划:国会背景和议题.pdf

  • 上传人:任**
  • 文档编号:32271
  • 上传时间:2022-06-24
  • 发布时间:2022-04-12
  • 格式:PDF
  • 页数:3
  • 大小:587.46KB
  • https:/crsreports.congress.gov Updated April 12, 2022Coast Guard Waterways Commerce Cutter (WCC) Program: Background and Issues for CongressIntroduction The Coast Guards Waterways Commerce Cutter (WCC) program envisages procuring 30 replacements for the Coast Guards 35 aging river buoy tenders (WLRs), inland construction tenders (WLICs), and inland buoy tenders (WLIs). The Coast Guard wants to award the first contract for constructing the new WCCs in FY2022, and to have the first new WCC be in service by 2025. The WCC program received $67.0 million in FY2022 procurement funding. The Coast Guards proposed FY2023 budget requests $77.0 million in procurement funding for the program. The issue for Congress is whether to approve, reject, or modify the Coast Guards proposed acquisition strategy and funding requests for the WCC program. Terminology Cutters are Coast Guard vessels that are more than 65 feet long and have accommodations for a crew. (Those less than 65 feet long are called boats.) Waterways refers here to the intra-coastal waterways along the U.S. East and Gulf coasts, and to U.S. inland waterways such as the Mississippi River. Tenders are vessels whose primary mission is t
    展开阅读全文
    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    20220412 IF11672_ 海岸 警卫队 水道 商业 切割机 WCC 计划 国会 背景 议题
    1
    提示  联参智库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:[20220412]IF11672_海岸警卫队水道商业切割机(WCC)计划:国会背景和议题.pdf
    链接地址:https://www.lianhezuozhan.com/doc/32271.html
    1

    客服:010-66465788   北京联参科技有限公司版权所有  工业和信息化部备案/许可证编号:京ICP备2022007273号-1



    联参智库